Lifting and transporting two 240-ton boilers
An incredible lifting
There is no transport operation that cannot be doneachieved, even when the size becomes significant/more of an issue.
In Brindisi we lifted two boilers of 240 tons each (48 meters long and 8 meters in diameter) with three cranes for theto positioning position them on SPMTs with 20 electronic axes. We then and transport ofed the samethem from the factory site to the port of Brindisi with Fas FAS yield delivery (a routes of about 10 km).
The activity required the removal and restoration of various obstacles/various pieces of street furniture along the route due to the size of the convoy.